Preparation

What Should I Do Before Having New Turf Laid?

Most of what goes wrong with a new lawn was decided before the turf arrived.

Updated 1 September 2026 Turfing · Hengrove

The Short Answer

Finish every other job in the garden, sort access and parking, make sure you can water, and settle the lawn's shape and levels.

Turf goes last — after clearance, tree work, fencing, hard landscaping and planting. Everything else involves traffic and spoil that new grass does not survive.

Finish the Other Work First

Cement is the one that really matters. Mortar or concrete spilled onto grass changes the soil pH and kills it permanently — no watering or feeding brings it back. If any wet trades are still to come, the turf waits.

Sort the Practicalities

Be Able to Water

Do not have turf laid if you cannot water it daily for the first two to three weeks. New turf has no root system and lives on the moisture in the roll — in warm weather that is gone in days. If you are going away, or there is a hosepipe ban, or you simply know you will not keep it up, wait for autumn. It costs the same in September and it survives.

Call Us Today For A Free Quote

Tell us what you need and we will arrange a free quotation.

Decisions to Make in Advance

DecisionWhy it matters
Lawn shapeCurves waste turf; simple shapes cost less
Where the edges runAgainst paths, borders, fence lines
Levels against pathsTurf should finish flush, not proud
Levels against the fenceBelow the gravel board, not against timber
Whether a path would serve betterOn a route that will be walked daily
What happens under treesGrass may not win there
Who will maintain itDecides how ambitious to be

What You Can Do Yourself

The two questions worth answering honestly before turf arrives are whether every messy job is finished, and whether you will really water it.

Timing

Turfing in Hengrove

See what our turfing service covers in Hengrove, or read more about the service across the areas we work in.

Turfing Hengrove → Turfing Bristol →

FAQs

Before Turfing in Hengrove — FAQs

What should I do before new turf is laid?

Finish every other garden job, sort access and parking, make sure you can water daily, and settle the lawn's shape and levels.

What work must be finished first?

Clearance, tree and hedge work, stump grinding, fencing, hard landscaping, drainage and planting. Turf always goes last.

Why does cement matter so much?

Mortar or concrete spilled on grass changes the soil pH and kills it permanently. If wet trades are still to come, the turf waits.

What if I cannot water it?

Then do not have it laid yet. New turf needs daily soaking for two to three weeks and can be lost in days without it. Autumn costs the same and survives.

What decisions should I make in advance?

The lawn's shape, where the edges run, levels against paths and fences, and whether a path would serve better on a route you walk daily.

Should the turf finish level with the fence?

Below the gravel board, not against the timber — soil banked against a fence shortens its life considerably.

What can I do myself beforehand?

Clear furniture and pots, move fragile things on the access route, mark out the shape with a hose, cut back overhanging growth and arrange parking.

When is the best time to have it laid?

Autumn, then spring. Summer works only with committed daily watering, and winter is slow with frozen or waterlogged ground stopping it entirely.

Request a Free Quote

Tell Us About Your Tree or Garden Work

Need tree surgery, hedge maintenance, fencing, garden clearance, turfing or power washing? Complete the form and tell us what work you require.

Prefer to speak to us? Call 07788 912140 or 01179 110230. We use your details only to respond to this enquiry — see our privacy policy.